fix(search): preserve Google sync diagnostics and retry transient failures #31741
Triggered via pull request
September 16, 2026 22:29
Status
Failure
Total duration
4m 29s
Artifacts
–
ci.yml
on: pull_request
Detect Version
Migrate Dev DB
/
Apply Database Migrations
Detect Desktop Changes
Matrix: Build AMD64
Matrix: Build ARM64 (GHCR Only)
Matrix: Test and Build / oauth-postgres
Matrix: Test and Build / test-shard
Test and Build
/
Lint and Test
3m 24s
Test and Build
/
Build App
3m 18s
Check Docs Changes
Matrix: Build Dev ECR
Deploy Trigger.dev (Dev)
Matrix: Create GHCR Manifests
Process Docs
/
Process Documentation Embeddings
Prune Desktop Prereleases
0s
Matrix: Attest Images
Desktop Release
/
Build, Sign, Notarize
Annotations
5 errors and 9 warnings
|
Test and Build / Lint and Test
Process completed with exit code 1.
|
|
connectors/gmail/company-crawl.test.ts > company-wide Gmail indexing > invalidates previous hydration authority when the next mailbox fails:
apps/sim/connectors/gmail/company-crawl.test.ts#L405
AssertionError: expected [Function] to throw error including '503' but got 'Gmail thread listing exceeds maximum …'
Expected: "503"
Received: "Gmail thread listing exceeds maximum size of 8388608 bytes"
❯ connectors/gmail/company-crawl.test.ts:405:5
|
|
connectors/gmail/company-crawl.test.ts > company-wide Gmail indexing > fails an unreadable mailbox instead of reporting a complete empty corpus:
apps/sim/connectors/gmail/company-crawl.test.ts#L396
AssertionError: expected [Function] to throw error including '403' but got 'Gmail thread listing exceeds maximum …'
Expected: "403"
Received: "Gmail thread listing exceeds maximum size of 8388608 bytes"
❯ connectors/gmail/company-crawl.test.ts:396:5
|
|
Test and Build / Lint and Test
@sim/app#test: command (/home/runner/_work/sim/sim/apps/sim) /home/runner/.bun/bin/bun run test exited (1)
|
|
Test and Build / Lint and Test
Process completed with exit code 1.
|
|
Test and Build / Lint and Test
Skipping sticky disk commit due to previous step failures
|
|
Test and Build / Lint and Test
- Step: unknown (failed)
|
|
Test and Build / Lint and Test
Found 2 failed/cancelled steps in previous workflow steps
|
|
Test and Build / Lint and Test
Skipping sticky disk commit due to previous step failures
|
|
Test and Build / Lint and Test
- Step: unknown (failed)
|
|
Test and Build / Lint and Test
Found 2 failed/cancelled steps in previous workflow steps
|
|
Test and Build / Lint and Test
Skipping sticky disk commit due to previous step failures
|
|
Test and Build / Lint and Test
- Step: unknown (failed)
|
|
Test and Build / Lint and Test
Found 2 failed/cancelled steps in previous workflow steps
|