docs(phase-2b): Phase 2B Skills Consolidation Planning & Architecture - #1375
docs(phase-2b): Phase 2B Skills Consolidation Planning & Architecture#1375ashleyshaw wants to merge 3 commits into
Conversation
|
Warning Review limit reached
Next review available in: 42 minutes Enable usage-based reviews in Billing to review now. Otherwise, wait until the next included review is available. How can I continue?After more reviews become available, a review can be triggered using the To avoid repeated limits, reduce automatic review volume by pausing incremental auto-reviews earlier, using label-based review opt-in, excluding WIP or generated PR titles, or requesting reviews manually when the PR is ready. If your team needs uninterrupted high-volume reviews, an organization admin can enable usage-based reviews. How do review limits work?CodeRabbit enforces per-developer PR review limits for each organization. Most developers receive the normal plan review availability. For paid Pro and Pro+ PR reviews, CodeRabbit uses adaptive limits for sustained high-volume activity. When a developer's recent PR review activity reaches the 95th percentile or higher among CodeRabbit users, additional reviews become available more gradually as earlier reviews age out of the rolling window. Please refer docs for additional details. Review details⚙️ Run configurationConfiguration used: Repository YAML (base), Organization UI (inherited) Review profile: CHILL Plan: Pro Plus Run ID: 📒 Files selected for processing (4)
✨ Finishing Touches🧪 Generate unit tests (beta)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
|
✅ Template check passed after update. Thanks for fixing the PR description. |
Establish Phase 2B planning structure with 4 comprehensive documents: 1. README.md - Project overview, timeline (W3-W4), success criteria, 3 key architectural decisions needing team input 2. SKILL-DEPENDENCY-MAP.md - Tier classification framework, agent-skill relationship matrix, reuse frequency ranking, conflict analysis 3. ARCHITECTURE-PLAN.md - Detailed decisions on Tier 0 consolidation scope (65 utilities), override system design (parameter-based), and resolution of 3 HIGH-severity conflicts (Figma, PRD agent, figma-code-connect) 4. IMPLEMENTATION-ROADMAP.md - Phase C execution plan (40-60 hours, W5-W12) with per-agent tasks, effort estimates, risk mitigation, success criteria Deliverables provide actionable roadmap for Phase C consolidation: - Extract 65 core utilities to Tier 0 (W1-W2) - Implement override system & resolve conflicts (W3-W4) - Migrate 50-60 Tier 1 skills across 16 agents (W5-W8) - Consolidate Tier 2/3 & release v2.0.0-rc1 (W9-W12) Related: Issue #1316 (Phase 2B planning), Epic #1079 Builds on: Phase A (merged PR #1283, Issue #1305) Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
f9b083e to
744095f
Compare
📄 README Validation❌ One or more README checks failed.
|
🔍 Reviewer Summary for PR #1375CI Status: ✅ Recommendations
|
Metadata governance
|
- Add file_type, description, owners, and tags to all documents - Standardize frontmatter format per documentation standards - Add cross-references for phase-2b, skills-audit, and architecture tags - Ensure frontmatter validation passes for all deliverables
⏱️ Aging and SLA annotation
Maintained by project-meta-sync workflow. |
- Fixed path depth: ../../../ → ../../../../ for root-level files - Corrected filename: AGENT-STANDARDS → AGENT_STANDARDS - Removed broken placeholder link to non-existent PHASE-C-IMPLEMENTATION-PLAN.md Relates to #1316
|
Tick the box to add this pull request to the merge queue (same as
|
Summary
Establish Phase 2B planning structure with 4 comprehensive documents for skills consolidation:
Provides actionable roadmap for Phase C: extract utilities to Tier 0, implement override system, migrate skills, consolidate tiers, release v2.0.0-rc1.
Linked Issues
Closes #1316 (Phase 2B planning)
Related: Epic #1079 (agent-standardisation)
Builds on: Phase A (merged PR #1283, Issue #1305)
Test plan
.github/projects/active/phase-2b-skills-audit/Changelog
Added:
Related: Issue #1316, Epic #1079
Checklist (Global DoD / PR)
🤖 Generated with Claude Code