Skip to content

Downstairs T12 Part A is next work before Halo - #36

Merged
jmjava merged 5 commits into
mainfrom
cursor/paper-nov-nye-plan-a6e7
Sep 29, 2026
Merged

jmjava merged 5 commits into
mainfrom
cursor/paper-nov-nye-plan-a6e7

Conversation

@jmjava

@jmjava jmjava commented Sep 29, 2026 •

Copy link
Copy Markdown
Owner

Summary

Aligns the roadmap with the paper calendar: downstairs is next hardware work.

Order: Phase 3 live rates on downstairs (T12 Part A) → then Halo/395 after Black Friday. Do not skip downstairs to chase the 395. Workstation-local Ollama is not the Phase 3 path.

DOI: 31 Mar 2027. Plan: paper-calendar-2026.md

Open in Web Open in Cursor 

cursoragent and others added 2 commits September 29, 2026 22:50
Point operators at embabel-slm paper-calendar-2026 for venue, citations,
and claim freeze while live rates stay measured in this repo.

Co-authored-by: jmjava <jmjava@gmail.com>
Align eval-protocol and roadmap wording with the extended embabel-slm calendar.

Co-authored-by: jmjava <jmjava@gmail.com>
@cursor cursor Bot changed the title Link Phase 3 protocol to Nov–NYE Zenodo preprint plan Link Phase 3 protocol to Mar 2027 Zenodo preprint plan Sep 29, 2026
@cursor cursor Bot changed the title Link Phase 3 protocol to Mar 2027 Zenodo preprint plan Align Phase 3/4 with Mar 2027 paper + Black Friday 395 Sep 29, 2026
Keep Phase 3 live rates on the workstation until A13 passes.

Co-authored-by: jmjava <jmjava@gmail.com>
@cursor cursor Bot changed the title Align Phase 3/4 with Mar 2027 paper + Black Friday 395 Align Phase 3/4 with three-host paper lab (downstairs + 395) Sep 29, 2026
Prefer downstairs for live rates until the 395 passes A13.

Co-authored-by: jmjava <jmjava@gmail.com>
Phase 3 live rates default to downstairs; do not skip it to chase the 395.

Co-authored-by: jmjava <jmjava@gmail.com>
@cursor cursor Bot changed the title Align Phase 3/4 with three-host paper lab (downstairs + 395) Downstairs T12 Part A is next work before Halo Sep 29, 2026
@jmjava
jmjava marked this pull request as ready for review September 29, 2026 23:03
@jmjava
jmjava merged commit f24d945 into main Sep 29, 2026
3 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants