v0.8.38: concurrent knowledgebase operations, media lightbox for chat #31522
Triggered via pull request
September 15, 2026 03:08
Status
Cancelled
Total duration
1m 24s
Artifacts
–
ci.yml
on: pull_request
Detect Version
0s
Migrate Dev DB
/
Apply Database Migrations
Detect Desktop Changes
0s
Matrix: Build AMD64
Matrix: Build ARM64 (GHCR Only)
Matrix: Test and Build / oauth-postgres
Matrix: Test and Build / test-shard
Test and Build
/
Lint and Test
42s
Test and Build
/
Build App
34s
Check Docs Changes
0s
Matrix: Build Dev ECR
Deploy Trigger.dev (Dev)
0s
Matrix: Create GHCR Manifests
Process Docs
/
Process Documentation Embeddings
Prune Desktop Prereleases
Matrix: Attest Images
Desktop Release
/
Build, Sign, Notarize
Annotations
7 errors
|
Test and Build / Lint and Test
Process completed with exit code 1.
|
|
Test and Build / PostgreSQL integration (migrate)
Canceling since a higher priority waiting request for ci-refs/pull/7844/merge exists
|
|
Test and Build / PostgreSQL integration (migrate)
The operation was canceled.
|
|
Test and Build / PostgreSQL integration (push)
Canceling since a higher priority waiting request for ci-refs/pull/7844/merge exists
|
|
Test and Build / PostgreSQL integration (push)
The operation was canceled.
|
|
CI
Canceling since a higher priority waiting request for ci-refs/pull/7844/merge exists
|
|
CI
Canceling since a higher priority waiting request for ci-refs/pull/7844/merge exists
|