Development Proportionality Workflow

Standards metadata

  • ID: workflow.development-proportionality
  • Role: workflow
  • Level: MUST
  • Applies when: Development work is being planned, or an additional prototype, design investigation, evidence cycle, review, or re-plan could delay implementation.
  • Does not apply when: Work is read-only and makes neither an implementation decision nor a development-sequencing decision.
  • Requires: core, workflow.implementation, workflow.verification
  • Specializes: none
  • Verification: Development-decision fixtures and metadata-route closure.
  • Canonical owner: workflows/development-proportionality.md

Development effort must be proportionate to decision-relevant uncertainty and the consequence it can prevent. Reuse an established mechanism that satisfies the affected requirements. Reconsider it for an evidenced mismatch in behavior, ownership, safety, compatibility, or cost.

Once the design satisfies the admitted product contract and applicable standards, prefer the smallest reversible production implementation unless a named unresolved issue threatens an irreversible or high-consequence outcome. Keep investigation cost within the plausible rework or consequence it can prevent. Quantify more closely when the measurement could change the decision and costs less than the reversible action.

This workflow owns the next development action. Architecture owns design admission; Verification owns claims and evidence value; Planning owns sequencing and plan maintenance. Preserve the user's explicit design choices and admitted contract.

Development Decision

Identify the current contract, design conformance, exact uncertainty, decision it could change, consequence of error, reversibility, and least costly adequate method. Choose one outcome:

Implement

Choose implement when the design satisfies the contract and standards and implementation is reversible without a plausible high-consequence outcome. Implementation can itself be the cheapest reliable observation.

Investigate

Choose investigate when a bounded investigation can resolve a missing fact preventing a conforming design.

For an already conforming design, investigate only when the uncertainty could change the current decision, error could cause irreversible/high-consequence harm or implementation would plausibly cost more, and the investigation has a named decision, adequate method, and observable stopping condition.

Defer And Implement

Choose defer-and-implement when a valid concern cannot change the current admitted decision. Preserve a durable follow-up when Planning or issue management requires it.

Blocked

Choose blocked when missing authority, information, or external state prevents implementation from satisfying the contract or standards. State the missing requirement precisely. Keep decision-changing unknown facts unavailable and contradictory facts invalid under the applicable diagnostic contract.

Investigation Admission

Before an investigation delays implementation, name its uncertainty, affected decision, plausible consequence prevented, cost comparison with implementation, least costly adequate method, and stopping condition.

Absent that basis, continue reversible implementation of an already conforming design. End the investigation at its stopping condition and return to the Development Decision. Evaluate adjacent uncertainty on its own decision relevance.

Boundary And Stopping Rules

Expand or block the slice for findings that invalidate its product contract, demonstrate a standards violation in its design, or materially change the reversibility or consequence assessment.

Keep review within the admitted decision boundary. After required contract and standards checks pass, require further evidence only for a newly established decision-relevant claim or risk.

Handoff

  • implement: proceed through Implementation and selected Verification.
  • investigate: answer one bounded question and reconsider the development decision.
  • defer-and-implement: proceed with the admitted slice and its required follow-up.
  • blocked: identify the missing authority, information, or external-state change.